Skip to main content
CADTRI

Permitting

ADU Permit Packages

Complete permit packages for accessory dwelling units and garage conversions.

Overview

Accessory dwelling units are one of the most permit-intensive residential project types in most jurisdictions. We produce the complete ADU permit package: architectural drawings, site plan, energy compliance documentation, utility connection details, and all supplemental materials required by the applicable building department and local ADU ordinance.

Why It Matters

ADU permit packages are heavily jurisdiction-specific. Local ADU ordinances vary significantly in setback requirements, owner-occupancy rules, design standards, and required supplemental documentation. Building the package without jurisdiction research first is the most common cause of correction cycles.

Package Includes

  • Existing and Proposed Floor Plans

    Dimensioned floor plans showing existing conditions and the proposed ADU layout, including all new walls, openings, and fixtures.

  • Elevations

    All building elevations showing the ADU exterior, heights, and relationship to the primary structure.

  • Site Plan with Setback Verification

    Site plan confirming ADU placement within required setbacks, lot coverage calculations, and access.

  • Energy Compliance Forms

    Title 24 or equivalent compliance documentation for the applicable jurisdiction.

  • Utility Connection Plan

    Water, sewer, and electrical connection documentation for the new unit.

  • Jurisdiction Supplemental Forms

    All required forms, owner affidavits, and documentation specific to the building department.

Getting Started

How it works.

Submit your project

Use our contact form to share your project type, site location, and any existing documentation. We respond within one business day to confirm scope.

We confirm and begin

Once scope and timeline are agreed, we begin jurisdiction research and package production. You have a single point of contact throughout.

Receive your package

Your complete, submission-ready package is delivered with all required documents organized and checked. We remain available for plan check support.

Common Questions

Frequently asked.

Still have questions? Contact us and we will answer them directly before you submit an inquiry.

Can you help with garage conversions?
Yes. Garage conversions to living space are treated as ADUs in most jurisdictions and we handle the complete permit package, including change-of-use documentation.
What is the typical delivery timeline?
Most ADU permit packages are delivered within 10-15 business days of intake, depending on project complexity and completeness of site information.
Do ADUs require energy compliance documentation?
Yes. Title 24 or equivalent energy compliance is required in most jurisdictions. We include the required compliance documentation in every ADU package.
Can you work from existing drawings?
Yes. If you have existing site plans or partial drawings, we can use them as the starting point and build the complete package from there.

Designed For

Who this service is for.

Property Owners

Converting a garage, building a backyard cottage, or adding a rental unit to an existing property.

Real Estate Investors

Adding ADUs to increase income potential on residential properties.

General Contractors

Building ADUs for clients who need a complete permit package before work begins.

Ready to get started?

Tell us your project scope and we will confirm the timeline, deliverables, and next steps.